Posted on behalf of Grid Metals Corp. - SGS ore-sorting and recovery results are guided six to eight weeks from mid-October, so roughly December. A new 2:47 explainer walks #cesium from rock to chemical in eight steps. GRDM.v, $MSMGF
Posted on behalf of Grid Metals Corp. - SGS ore-sorting and recovery results are guided six to eight weeks from mid-October, so roughly December. A new 2:47 explainer walks #cesium from rock to chemical in eight steps. GRDM.v, $MSMGF
0 vue
Publié le 25/11/2026 21:13
2:47
Posted on behalf of Grid Metals Corp. - SGS ore-sorting and recovery results are guided six to eight weeks from mid-October, so roughly December. A new 2:47 explainer walks #cesium from rock to chemical in eight steps. GRDM.v, $MSMGF
1 commentaire
?
Steps three and four are under test: a sensor scans every rock on the conveyor, a puff of air kicks pollucite into the product bin. Cesium is heavy, so pollucite stands out to X-ray. Dry, no water, no reagents.
Sorting lifts grade to roughly 10% to 20% Cs2O, the spec the SGS work is scoped to constrain, done on site by crushing and ore sorting.