Carmel, IN promised a "continuous, level" multi-use path with solid separation.
They got close and then city engineering predictably dropped the ball on a few key details. It's still a win, so I won't make perfect the enemy of good.
A thread: 🧵
Carmel, IN promised a "continuous, level" multi-use path with solid separation. They got close and then city engineering predictably dropped the ball on a few key details. It's still a win, so I won't make perfect the enemy of good. A thread: 🧵
0 vue
Publié le 27/11/2026 14:29
0:56
Carmel, IN promised a "continuous, level" multi-use path with solid separation.
They got close and then city engineering predictably dropped the ball on a few key details. It's still a win, so I won't make perfect the enemy of good.
A thread: 🧵
1 commentaire
?
The biggest failure here is the "door lane" design. Naturally, they baked parking into the redevelopment right against the path. You should never put a path next to parking. People open doors, hit someone on a bike, and believe it or not, people die from it.
Range Line Rd used to look like this. It catered exclusively to cars, adding to the stroad-chaos of the city until a reallocation of space was made, which all cities have the ability to do. This opens up mobility options to more ages and abilities and costs very little.