Now that tunnelling has commenced, I went for a cheeky squiz this afternoon at the Melbourne Suburban Rail Loop site at Burwood. One of these trucks emerges every 7 minutes and dumps its spoil on that pile. Occasional twin-trailer trucks enter the site to be loaded by that digger to remove spoil.
Now that tunnelling has commenced, I went for a cheeky squiz this afternoon at the Melbourne Suburban Rail Loop site at Burwood. One of these trucks emerges every 7 minutes and dumps its spoil on that pile. Occasional twin-trailer trucks enter the site to be loaded by that digger to remove spoil.
0 vue
Publié le 09/09/2026 05:57
1:45
Now that tunnelling has commenced, I went for a cheeky squiz this afternoon at the Melbourne Suburban Rail Loop site at Burwood. One of these trucks emerges every 7 minutes and dumps its spoil on that pile. Occasional twin-trailer trucks enter the site to be loaded by that digger to remove spoil.
100 years later, 3 miles of tunnel remain, yet no train ever ran.
I really want the SRL to be built, but I worry that instead it will become our own Cincinnati Subway.