Skip to main content
Bluvy Tube
Press Esc to exit fullscreen
Volume m
/
i
Theater mode t
f
/
The older trains aren’t compatible with the onboard equipment required for the newer CBTC signalling the TTC since installed on Line 1 and will eventually on Line 2 (which is needed for accurate stopping in line with platform screen doors). Some videos I got when an operator had his door open:

Keyboard shortcuts

Space K
Play / pause
← →
Back / forward 5 s
J L
Back / forward 10 s
0–9
Jump to 0%–90% of the video
Home End
Start / end
, .
Previous / next frame (while paused)
< >
Slower / faster
↑ ↓
Volume
M
Mute / unmute
C
Captions
F
Fullscreen
I
Picture-in-picture
T
Theater mode
?
Show this help

The older trains aren’t compatible with the onboard equipment required for the newer CBTC signalling the TTC since installed on Line 1 and will eventually on Line 2 (which is needed for accurate stopping in line with platform screen doors). Some videos I got when an operator had his door open:

JackTatt 🇨🇦

JackTatt 🇨🇦

@jacktatttran.bsky.social

Subscribe
0 views Published on 21/08/2026 02:15
The older trains aren’t compatible with the onboard equipment required for the newer CBTC signalling the TTC since installed on Line 1 and will eventually on Line 2 (which is needed for accurate stopping in line with platform screen doors). Some videos I got when an operator had his door open:
3 comments
?
The audio! 🔥 😱 It isn’t just fire; it’s also a way to get away from creeps. With the Yonge trains, you have to get off and wait for the next one

Yeah I’d heard that about the Bloor-Danforth trains, that the new signalling isn’t compatible but those signals are needed for suicide prevention gates.
Regardless, platform screen doors would be really useful for safety, reliability, and passenger comfort (makes ventilation and heating/cooling easier specifically in new stations). As others have said before, the TTC’s cost estimates don’t make sense with global comparisons, TTC should do better.
I’m old enough to remember when the TTC was world renowned. Then the 1980s hit, and we got a “too much change happening, let’s do nothing” mayor. Then when at last subway building back on, we got a “common sense” Premier who canned almost all of the new lines, TTC nosedived; we’re still suffering.
More videos
And more…
View original post on Bluesky
Link copied to clipboard

Sign in

Time to take a break

You've been watching videos for 30 minutes straight: give yourself 5 minutes away from the screen. Stand up, stretch, grab a glass of water… Your videos will be right here when you're back.