Skip to main content
Bluvy Tube
Press Esc to exit fullscreen
Volume m
/
i
Theater mode t
f
/
Aerial video of a bulldozer in the excavated work site for an additional attraction in Dark Universe. Clearing mud eroded by recent days of continuous rain in Central Florida.

Keyboard shortcuts

Space K
Play / pause
← →
Back / forward 5 s
J L
Back / forward 10 s
0–9
Jump to 0%–90% of the video
Home End
Start / end
, .
Previous / next frame (while paused)
< >
Slower / faster
↑ ↓
Volume
M
Mute / unmute
C
Captions
F
Fullscreen
I
Picture-in-picture
T
Theater mode
?
Show this help

Aerial video of a bulldozer in the excavated work site for an additional attraction in Dark Universe. Clearing mud eroded by recent days of continuous rain in Central Florida.

bioreconstruct

bioreconstruct

@bioreconstruct.bsky.social

Subscribe
0 views Published on 11/10/2026 03:37 0:48
Aerial video of a bulldozer in the excavated work site for an additional attraction in Dark Universe. Clearing mud eroded by recent days of continuous rain in Central Florida.
1 comment
?
Oct 9 aerial overview of excavations and pilings in progress at Dark Universe.
A retaining wall at center indicates the overall depth of the site prep for an additional attraction.
Looks like a total slog
View original post on Bluesky
Link copied to clipboard

Sign in

Time to take a break

You've been watching videos for 30 minutes straight: give yourself 5 minutes away from the screen. Stand up, stretch, grab a glass of water… Your videos will be right here when you're back.