Happy #FieldworkFriday! For the LEBA seismic station rebuild, one of our senior network engineers brought along his own backhoe to help us dig. At over 8 feet, this is now one of the deepest vaults the PNSN team has installed thanks to the equipment and assist!
Happy #FieldworkFriday! For the LEBA seismic station rebuild, one of our senior network engineers brought along his own backhoe to help us dig. At over 8 feet, this is now one of the deepest vaults the PNSN team has installed thanks to the equipment and assist!
0 views
Published on 13/11/2026 21:00
0:13
Happy #FieldworkFriday! For the LEBA seismic station rebuild, one of our senior network engineers brought along his own backhoe to help us dig. At over 8 feet, this is now one of the deepest vaults the PNSN team has installed thanks to the equipment and assist!
0 comments
?